led bulkhead light installation steps, use this way, the installation only takes 10 minutes

Today we are going to introduce the installation steps of ceiling lamps in detail. Most friends will choose ceiling lamps with reasonable price and beautiful appearance when decorating new houses.

Let's have a look.

1. Turn off the power to the area you are installing the LED bulkhead light.

2. Use a drill to make two holes in the wall, large enough to fit the bulkhead light.

3. Run the electrical wires through the holes and connect them to the LED bulkhead light.

4. Secure the LED bulkhead light to the wall using appropriate screws.

5. Connect the electrical wiring to the electrical box.

6. Turn the power back on and test the LED bulkhead light to make sure it is functioning properly.

7. If the LED bulkhead light is working properly, seal the holes with appropriate sealant.

8. Wipe the LED bulkhead light and the wall around it with a damp cloth.

9. Secure the cover of the LED bulkhead light.

10.Turn on the light and enjoy your new LED bulkhead light!

Here are some precautions to be taken when installing ceiling lamps:

● Please make sure that the power supply is off or the power line reserved for installation is not energized, otherwise there may be danger of electric shock, which is the most important step and must not be careless.

● If the screw lamp head is used in the installed ceiling lamp, the wiring should also pay attention to the following two points: ① The phase wire should be connected to the terminal of the center contact, and the zero wire should be connected to the terminal of the thread. ② The insulation shell of the lamp holder should not be damaged and leakage, in order to prevent electric shock when replacing the lamp.

● Ceiling lamps should not be installed directly on combustible objects. Some families line the back of the ceiling lamps with three clamps painted with paint for beauty, which is actually dangerous. Heat insulation measures must be taken. If the high temperature part of the lamp surface is close to combustible materials, heat insulation or heat dissipation measures must also be taken.