Short Lead Time for 200w High Bay Lighting - Magnetic LED Troffer Retrofit Kit – Eastrong
Short Lead Time for 200w High Bay Lighting - Magnetic LED Troffer Retrofit Kit – Eastrong Detail:
Technical Specification
Size |
Power (W) |
Input Voltage (V) |
CCT (K) |
Lumen (lm) |
CRI (Ra) |
PF |
LED Type |
PC Cover |
2FT |
20 |
AC100-277 |
3500 4000 4500 5000 |
2600 |
>80 |
>0.9 |
SMD2835 |
Frosted, Clear |
30 |
3900 |
|||||||
40 |
5200 |
|||||||
4FT |
20 |
AC100-277 |
3500 4000 4500 5000 |
2600 |
>80 |
>0.9 |
SMD2835 |
Frosted, Clear |
40 |
5200 |
|||||||
60 |
7800 |
|||||||
80 |
10400 |
Dimension
We support custom-made parameters, specifications and package of all the products.
Customers are warmly welcome to visit our factory!
Product detail pictures:
Related Product Guide:
Cooperation
We always believe that one's character decides products' quality, the details decides products' quality ,with the REALISTIC,EFFICIENT AND INNOVATIVE team spirit for Short Lead Time for 200w High Bay Lighting - Magnetic LED Troffer Retrofit Kit – Eastrong , The product will supply to all over the world, such as: Muscat, Hyderabad, London, You can always find the products you need in our company! Welcome to inquire us about our product and anything we know and we can help in auto spare parts. We are looking forward to work with you for a win-win situation.
By Dee Lopez from New Zealand - 2017.11.29 11:09
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
By Lilith from Switzerland - 2017.08.15 12:36
Write your message here and send it to us