Short Lead Time for Led Tube T8 1200mm - PC Surface Mount T8 Tube Fitting – Eastrong
Short Lead Time for Led Tube T8 1200mm - PC Surface Mount T8 Tube Fitting – Eastrong Detail:
Technical Specification
Model No. |
Size (cm) |
Power (W) |
Input Voltage (V) |
CCT (K) |
Lumen (lm) |
CRI (Ra) |
PF |
IP Rate |
Certificate |
TU003-06C008 |
60 |
8 |
AC100-277 |
3000-6500 |
960 |
>80 |
>0.9 |
IP20 |
EMC,LVD |
TU003-12C016 |
120 |
16 |
AC100-277 |
3000-6500 |
1920 |
>80 |
>0.9 |
IP20 |
EMC,LVD |
TU003-15C020 |
150 |
20 |
AC100-277 |
3000-6500 |
2400 |
>80 |
>0.9 |
IP20 |
EMC,LVD |
Dimension
Model No. |
A(mm) |
B(mm) |
C(mm) |
TU003-06C008 |
600 |
30 |
36 |
TU003-12C016 |
1200 |
30 |
36 |
TU003-15C020 |
1500 |
30 |
36 |
Installation
Application
Supermark, Shopping mall, family mart;
Workshop, factory, warehouse, parking lot;
School, office, corridor;
We support custom-made parameters, specifications and package of all the products.
Customers are warmly welcome to visit our factory!
Product detail pictures:
Related Product Guide:
Cooperation
We're going to commit ourselves to giving our esteemed buyers using the most enthusiastically considerate solutions for Short Lead Time for Led Tube T8 1200mm - PC Surface Mount T8 Tube Fitting – Eastrong , The product will supply to all over the world, such as: Tunisia, Moldova, Latvia, The quality of our products is equal to OEM's quality, because our core parts are the same with OEM supplier. The above products have passed professional certification, and we not only can produce OEM-standard products but we also accept Customized Products order.
By Kim from Greece - 2018.12.22 12:52
Problems can be quickly and effectively resolved, it is worth to be trust and working together.
By Joa from Croatia - 2017.08.28 16:02
Write your message here and send it to us